A Proposal for the Construction of a One Storey Residential Building
Prepared for the Fulfillment of the Course
English for Engineers
Submitted to
Mr. Jayson S. Patalinghug
Instructor
By
Jay Fred D.Telin
Michaelle Ann M. Mencias
Cris M. Trazo
May 7, 2008
____________________
TABLE OF CONTENTS
Abstract
Introduction
Purpose
Problem
Scope
Proposed Project
Section 1: Description of the Project
Section 2: Costs
Section 3: Capability
_____________
LISTS OF ILLUSTRATIONS
Figure 1: Perspective of the House
Figure 2: Floor Plan
Figure 3: Front Elevation
Figure 4: Rear Elevation
Figure 5: Right side Elevation
Figure 6: Left side Elevation
_____________________
Abstract
The client spends more than forty two thousand pesos yearly for his house rental. Aside from the house rental he also spends for his daily transportation from Libertad to SJIT.
The construction of a one storey residential building will solve the present problem of the client. The estimated cost is approximately 1.15 million pesos.
The proposed project is capable of giving comfort to the client. This building will last for long, long years.
With these positive capabilities of the project, the proponents strongly recommend its approval.
___________________
Introduction
Purpose:
This paper proposes to construct a one storey residential building which includes three bedrooms, two toilets and bathrooms, living room, spacious kitchen and extravagant porch. This house is designed to create a soothing environment bringing the comfort of a rural life in the urban area.
Problem:
The client spends forty two thousand pesos a year for his house rental at Acosta Subdivision, Libertad, Butuan City. Aside from the house rental he also spends for his daily transportation from Libertad to SJIT. The client also wanted to bring the environment of the rural area into the urban place like Butuan City.
Scope:
Section 1 of this paper will show the sketch of the proposed residential building together with the floor plan, four elevations and the perspective.
Section 2 will show the cost of materials including the payments of the workers.
Section 3 will show the capability of the house to meet the needs of the clients.
Section 4 will be devoted to facilities requirements. Recommendations will come after sections 1 - 4.
Schedule of work/activities will be presented after the approval of this paper.
_______________
Section 1
Description of the Project
Verbalization of the sketch
__________________________
Section 2
Costs
The cost of the residential building is roughly estimated. The rough estimate of this building is eleven thousand pesos per square meter. The total area of the residential building is one hundred twenty eight square meter. Therefore the cost of this building is one million and one hundred fifty two thousand pesos.
Computation:
9,000 pesos/sq. meter (128 sq. meters ) = 1,152,000 pesos
Costs Break Down
Item Amount
Cements - - - - -- - - - - - 35,000
Steel - - - - - - - - - - - 200,000
Gravel - - - - - - - - - - - - 20,000
Nara wood - - - - - - - - - - 65,000
Roof (G.I) - - -- - - - - - - - - 40,000
Tiles - - - - - - - - - - - - - - - 200,000
Plywood ------ - - --- - - - - 15,000
Hardiflex - - -- - - - - - - - - - 15,000
Others - -- - - - - - - - - - - 560,000
Total P1,150,000.00
___________________
Section 3
Capability
The one storey residential building will address the present problem of the client. This building will last for long, long years because of the materials that we are going to use in the construction.
It is also capable of bringing comfort to the client because of its wide area and space.
This building can accommodate at least five to six residents.
Section 4
Facilities and Personnel Requirements
Television sets, computer system, air conditioner, refrigerator or any kind of appliances will be provided by the residents of the house.
For light and water, there is no need to worry because, there are separate meters for these existing set-up. Perhaps a professional and licensed engineer will set-up the facilities stated above
Conclusions and Recommendations
From the remain that we have gathered and from the data presented, it is safe to conclude that:
1. Construction of a one storey residential building will cost approximately 1.15 million pesos, equivalent to 20 years expenses of the client.
2. The vacant lot of the client along Montilla Boulevard where the building will be constructed will be useful at last.
3. The proposed project is capable to:
a. Solve the present problem of the client.
b. Reduce his burden in terms of transportation.
c. Bring a good atmosphere to the residents.
With all of the propose project, the proponents strongly recommend
approval the capabilities .